Skip the field book

Story

The loft opened because a printed arrow kept missing Ellis Park.

Otis’s own 5-iron carried a factory path stamp and still traveled river-side on wet brick. The hangtag was not a liar so much as a mute. He started staking strings in 2008, the year the river came into the first-floor shops. Suite 5 is on the second floor on purpose.

We are not a museum of heads. If a path cannot hold a pin, we name a builder on 16th Avenue and send you down the stairs. The field book stays a field book.

Path Rail

A NewBo survey loft that stakes swing path as a string-line: in-to-out as an east bearing, out-to-in as a river bearing, never as a box arrow.

(319) 555-0141

Field desk

Path Rail
200 1st St SE, Suite 5
Cedar Rapids, IA 52401

desk@pathrail.shop

Yard hours

  • Sundayyard cold
  • Monday6:30 AM – 4:00 PM
  • Tuesday6:30 AM – 4:00 PM
  • Wednesday6:30 AM – 4:00 PM
  • Thursday6:30 AM – 4:00 PM
  • Friday6:30 AM – 3:00 PM
  • Saturdayyard cold

Pin index

Path Rail · Cedar Rapids · chain opened 2008

200 1st St SE, Suite 5 · Cedar Rapids · IA 52401